Shop Fabrication Inspection 1 Material Receiving Inspection Report Ø Check visual (free of lamination & damage). Ø Check certificate (keaslian, Heat No & Plate No). Ø Check dimensional (Length, Thickness, Width & Diameter). 2 Marking Ø Check dimensional marking. Ø Check transfer heat no. 3 After Cutting Ø Check dimensional. Ø Check traceability (Heat No & Plate No). Ø Check Stamp Marking. 4 Rolling Ø Check visual (free of damage). Ø Check edge preparation. Ø Check Rolling radius. 5 Painting Ø Check material painting (batch no, self life, brand). Ø Check Ambient Condition (surface & whether). Ø Check DFT. Field Erection Inspection 6 Dimensional Inspection 1 Peaking banding Peaking measured using a horizontal sweep board 36 inch (900 mm) long. Tolerance of peaking shall not exceed